Structure Shop
Piping Shop CS
Piping Shop SS
NDT Bunker
B&P Shop
Mega Module Shop
Erection Area
Quayside
Warehouse
Resource Synergies

Structure Fabrication Shop

Crane

4 Overhead Carnes inside & "A" Frame Cranes serve surrounding outside storage area.

Equipment

Outfitted with CNC Plasma/Oxy-Gas plate cutting beds, tubular coping, drilling and band saw.

Carbon Steel Pipe Shop

Crane

10 Overhead Carnes & "A" Frame Cranes serve the work.

Equipment

Outfitted with High Speed Band Saw, Rotating Oxy-Gas cutting and Automatic Welding equipment (SAW FCAW GTAW).

NDT

Configure a dedicated NDT bunker for CS pipe at shop exit.

Stainless Steel Pipe Shop

Crane

17 Overhead Carnes & "A" Frame Cranes serve the work.

Equipment

Outfitted with High Speed Band Saw, Rotating Oxy-Gas cutting and Automatic Welding equipment (SAW FCAW GTAW).

NDT

Configure a dedicated NDT bunker for SS pipe at shop exit.

Radiography Bunker

4 Bays

Located in South End of the Pipe Shops.

Overhead cranes are utilized for spool transportation through the Bunker.

Blasting & Painting Facility

Chambers

2 Blast chambers & 2 Paint chambers for large deck or modules. Dedicated 1 blasting & 2 painting chambers for SS piping spools.

Equipment

Outfitted with vacuum recovery machine, emission treatment, dehumidifier systems and compressor air dry equipment.

Resource Synergies

Total 12 Blasting & 23 Painting shops, combined with Shareholder’s shipyard.

Mega Module Assembly Shop

Dimension

200 m x 120 m x 42 m, 4 bays.

Crane

Served by 14 overhead cranes, including 2 sets of 300 MT capacity cranes.

Module Fabrication and Assembly

Tailor made for module fabrication and assembly.
To ensure 24/7 operations for entire module or deck assembly activities.
To maximize project delivery certainty.

Open Erection Area

210,000 M2

150 MT/M2

bearing capacity, convenient for mega module construction.

Yard Quayside

376 M

Quayside Length

11 M

Water Depth at LAT

3.5 Km

Navigation Channel from Yard

2 Piled Areas

Designed for Heavy Load

Warehouse

Covered Warehouse

Store Project and Non-Project Parts Materials

Materials Received are Segregated by Type and Project

One Bay of Climatic Controlled
For Critical Materials and Equipment

Two Bays for Equipment Storage

Two Bays for High Density Storage

Resource Synergies

Below resources coming from Shareholder are available as and when required.


60,000 m2 developed Material Storage Area

1000,000 m2 developed Assembly/Laydown Area


10 Blasting Shops

21 Painting Shops

6,000 m Quayside

5 Dry Docks

Yard Facility

18 MILLION

Man Hours Per Year

90,000 MT

Tonnage Capacity Per Year

Optimal Efficiency Layout

With a circular process flow

Fully Enclosed

Blasting and Painting Facilities

24/7 Operations

in Mega Module Assembly Shop

  • 4.结构车间
  • 6.管子车间CS
  • 5.管子车间SS
  • 9.无损检测仓
  • 7.打砂喷漆车间
  • 2.模块车间
  • 1.总装场地
  • 3.码头
  • 8.仓库
  • 0.协同增效场地